Shandong Xjy Paper Waste Incinerator, Printing Waste Incinerator, Waste Management

Customization: Available
Condition: New
Certification: ISO, CE

Product Description

Basic Specifications

Model NO.
XJY-50
Automation
Semi-Automatic
Treatment
Chemical Treatment
Package
Customized
Trademark
XJY
HS Code
8417809090

Product Description

XJY series of MSW incinerator introduces advanced technologies and research developed with independent intellectual property rights. The equipment offers significant advantages including closed operation, compact volume, high efficiency, and a reasonable combustion process. It represents a high level of harmless waste treatment technology, making it an ideal solution for hospitals, hotels, stations, and commercial organizations.

Daily Maintenance

  • The circuit and power supply switch should be closed when not working.
  • Clean the oil filter regularly to ensure smooth operation.
  • Clean dust from the two combustion chambers every two months.
  • Replace the [Ca(OH)2] regularly as part of the chemical treatment process.
  • Perform regular maintenance on the burner.
  • Conduct regular maintenance of the fan system.

Technical Index

Types of Wastes Incineration Temp (ºC) Residence Time (S) Efficiency (%) Residue Ignition Loss (%)
Hospital Clinical Waste ≥850 ≥2.0 ≥99 ≤5

Flue Gas Discharge Standards

No. Pollutants Unit GB18484-2001 Standard
1Blacknessmg/m1
2Smoke and Dustmg/m100
3COmg/m100
4SO2mg/m200
5HFmg/m9.0
6HCLmg/m100
7NO2mg/m500

Frequently Asked Questions

Are you a factory or trading company?
We are a factory with over 8 years of rich experience in manufacturing water processing and waste treatment equipment.
Do you have a minimum order quantity (MOQ)?
There is no minimum order requirement, and discounts are available for large quantity orders.
What certificates do you hold?
We hold ISO, CE, and SGS certificates to ensure the highest quality standards.
Can you provide customized designs?
Yes, our professional design team can provide tailored drawings and solutions based on your specific requirements.
What are your payment terms?
We accept TT and L/C. Typically, a 30% deposit is required before production, with the 70% balance paid before loading via TT.
What is the expected delivery time?
Delivery time depends on order quantities, but generally, it falls within 3 to 4 weeks.

Related Products